The Short Answer
- Start with the permanent sign. It can take 2 to 3 months with a permit, so temporary banners cover the gap.
- Order banners and window graphics 3 weeks out; put an Opening Soon banner up about 2 weeks before.
- Keep A-frames on your own property. NYC treats A-frames on the public sidewalk as an obstruction.
- NYC zoning counts banners as signs, so plan temporary banners as short-term and take them down after the opening.
Timeline

The Checklist
| Item | Where | Tip |
|---|---|---|
| Opening Soon banner | Sign band or storefront | Add the date and your website or handle |
| Now Open or Grand Opening banner | Same spot, swapped on opening day | Short words, big letters |
| Window graphics | Inside the glass | Hours, services and an offer |
| Store hours lettering | Door glass at eye level | Cut vinyl lasts for years |
| A-frame | Inside your property line or entry | Swap the insert for each promotion |
| Permanent sign | Sign band | Order first; it takes the longest |


NYC Rules
NYC zoning counts banners as signs. A DOB permit is needed for signs unless painted, or under 6 sq ft and not lit.
Sanitation treats A-frame and sandwich board signs on the public sidewalk as an obstruction.
The usual way to promote an opening without hardware on the façade.
LPC reviews signs on landmarks and in historic districts.

Banner Sizes
| Spot | Common size |
|---|---|
| Sign band over a small storefront | 2 x 8 ft or 3 x 10 ft |
| Over the windows | 3 x 6 ft to 3 x 8 ft |
| Wide storefront | 4 x 12 ft or larger |
Measure the space and leave a few inches on each side. For material and hanging, see banner materials and how to hang a vinyl banner.
After the Opening

Take the temporary banners down when the permanent sign goes up, roll them print side out, and keep them for the anniversary or a reopening. See our storefront sign checklist for the permanent sign.
Send the storefront photo, the opening date and your logo. We reply with a banner and window graphics package, a price and the dates to order.
Grand Opening Sign Questions, Answered
When should I order grand opening banners?
About 3 weeks before opening, so there is time for proofs and printing. Put an Opening Soon banner up about 2 weeks out.
Do I need a permit for a grand opening banner in NYC?
NYC zoning counts banners as signs, and DOB requires a permit unless a sign is painted, or under 6 sq ft and not lit. Keep temporary banners short-term.
Can I put an A-frame on the sidewalk in NYC?
NYC treats A-frames on the public sidewalk as an obstruction. Keep them on your own property or in your entry.
What size banner fits a storefront?
Common sizes are 2 x 8 ft or 3 x 10 ft for a sign band and 3 x 6 ft to 3 x 8 ft over the windows.
What should a grand opening banner say?
A few big words: Grand Opening or Now Open, the date and your handle or website.
Ask a Sign Maker
Planning a store opening? Send the date and a storefront photo. A project manager answers by email within one business day.
Sources and Further Reading
NYC
- NYC DOB: Business signs card (PDF)
- NYC Zoning Resolution 12-10: Definitions
- NY Senate: Bill memo on A-frame signs as sidewalk obstructions