Family owned since 1995 · Born in Brooklyn

Mon–Sat 8am–6pm · Emergency calls 24/7

NYC Rules & Permits · Costs

NYC Sign Permit Cost and Timeline

The NYC sign permit cost is more than the DOB fee. Here is what the city charges, the other pieces every permit job needs, and why most permits take 2 to 3 months.

The Short Answer

  • The DOB fee is set by the code: the alteration filing fee plus $5 per 100 sq ft of sign for a wall sign, with a $35 minimum on the sign part.
  • Lit signs that project past the building line also pay a yearly fee: $45 up to 30 sq ft, $70 up to 50 sq ft, and $0.75 per sq ft above that.
  • The rest of the cost is people: drawings, an expediter, a licensed sign hanger and, for lit signs, a licensed electrician. Each is quoted per job.
  • Plan for 2 to 3 months from the first drawing to the permit in NYC. The sign can be built while DOB reviews it.

DOB Fees for Sign Permits

NYC sign permit fees are in Table 28-112.2 of the Administrative Code. The base for every sign is the alteration filing fee, which depends on the cost of the work and the building. For buildings under 7 stories and under 100,000 sq ft, the table starts at $280 for the first $3,000 of work.

Sign typeDOB fee
Wall, ground or structure-mounted signAlteration filing fee + $5 per 100 sq ft of sign (min. $35)
Roof sign, solid surfaceAlteration filing fee + $15 per 100 sq ft (min. $70)
Lit sign projecting past the street line, up to 30 sq ft per sideAlteration filing fee; annual use fee $45
Lit projecting sign, over 30 up to 50 sq ft per sideAlteration filing fee; annual use fee $70
Lit projecting sign, over 50 sq ft per sideAlteration filing fee; annual use fee $0.75 per sq ft (min. $130)

A lit sign also needs an electrical permit, filed separately by a licensed electrician, with its own DOB fee.

Other Costs on a Permit Job

Drawings

Sign drawings and a façade elevation with sizes, mounting and lighting, prepared for the filing.

Expediter

Files the application in DOB NOW, answers objections and follows it to approval. Signs NYC works with an expediter on permit jobs.

Licensed sign hanger

Required for most signs over 75 sq ft or 25 lbs. Signs NYC has a licensed sign hanger on the team.

Electrician

Files the electrical permit and connects the sign.

LPC review

Landmark buildings and historic districts need LPC approval first. It adds time, not a city fee.

Violations

Open violations on the building can hold up a new permit until they are cleared.

These costs depend on the sign, the building and the borough, so we quote them with the sign. See our guide to business sign cost in NYC for sign prices.

Example NYC DOB sign permit with fictitious details for an illuminated sign
What a sign permit looks like. This example uses fictitious details and is marked as an example.

Timeline: 2 to 3 Months

Typical NYC sign permit timeline of 2 to 3 months, with fabrication running during DOB review
A typical permit job. DOB review takes the longest; fabrication runs at the same time so the sign is ready when the permit is issued.
  1. Survey and photosWe measure the sign band and photograph the façade.
  2. DrawingsSign drawings and the elevation are prepared for the filing.
  3. FilingThe application goes into DOB NOW with the owner's authorization.
  4. Review and objectionsDOB reviews. Any objections are answered and the filing is resubmitted.
  5. Permit issuedThe permit is issued and the install date is set.
  6. Install and sign-offThe licensed sign hanger installs; the electrician connects a lit sign.

What Slows a Permit Down

  • Landmark review. LPC approval comes before DOB.
  • Missing owner authorization. The building owner must sign off on the filing.
  • Open violations on the building, including old sign violations.
  • Zoning problems, such as a sign that is too big for the district or too high on the wall.
  • Changes after filing. A new size or lighting type means revised drawings.
Installing first and filing later is risky. A sign put up without a required permit can lead to violations and fines, and may have to come down.

Annual Fees for Lit Projecting Signs

If the sign is lit and extends past the building line, such as a lit blade sign, an annual illuminated sign permit may also be required. DOB bills it automatically each year. Flat lit signs on the wall that do not project past the building line do not pay this yearly fee.

How to Start

Send the address, a photo of the storefront and the sign you want. We check zoning and landmark status, then quote the sign, the drawings, the filing and the install together. See our sign permit service and the storefront sign checklist.

Get Your Sign Permit Started

Send the address and a storefront photo. We check zoning and landmark status and quote the sign and the permit together.

Sign Permit Cost Questions, Answered

How much is a sign permit in NYC?

The DOB fee is the alteration filing fee plus $5 per 100 sq ft of sign (minimum $35) for a wall sign. Drawings, expediter, sign hanger and electrician costs are added and quoted per job.

How long does a NYC sign permit take?

Plan for 2 to 3 months from the first drawing to the issued permit. Landmark review or objections can add time.

Is there a yearly fee for a lit sign in NYC?

Lit signs that project past the building line pay an annual use fee: $45 up to 30 sq ft, $70 up to 50 sq ft, and $0.75 per sq ft above that.

Do I need an electrical permit for a lit sign?

Yes. A licensed electrician files a separate electrical permit for any sign that needs a power connection.

Can the sign be made while the permit is in review?

Yes. Channel letters take 3 to 4 weeks to build, so fabrication usually runs during DOB review.

Ask a Sign Maker

Have a question about a sign permit for your storefront? Send it with the address. A project manager answers by email within one business day.

Abie S., Signs NYC
Written by Abie S., Signs NYC

Abie S. writes for Signs NYC. Signs NYC has designed, built and installed signs and awnings in New York City since 1995, with shops in Brooklyn and Linden, NJ. About us

Sources and Further Reading

NYC code and DOB

Link copied
MULTI-LOCATION SUPPORT

National Accounts & Fleet Branding

Surveys, permits, production, installation and maintenance for franchises and national brands with locations in NYC, New Jersey and beyond.

To qualify you'll need

A registered business, plus a resale certificate (NY ST-120, NJ ST-3 or your state's form) or business license. Trade accounts are reviewed before pricing is shared.

Step 1 of 2
Become a Trade Partner

Tell us about your business. We review every application.

Type of business
Resale certificate or business license
(PDF or photo, optional now, required before first order)