When a job blocks a NYC sidewalk, people on foot need a clear, safe way around it. The national sign manual (MUTCD) sets the signs, and NYC DOT sets when a closure needs a permit. Here is how the two fit together.

The Short Answer

  • NYC keeps at least 5 ft of clear sidewalk. If work leaves less than that, the job needs a temporary sidewalk closing permit from NYC DOT.
  • MUTCD signs: R9-9 Sidewalk Closed, R9-10 Use Other Side, R9-11 Closed Ahead Cross Here, R9-11a Cross Here.
  • Standard sizes: 24 x 12 in for R9-9, R9-10 and R9-11a, 24 x 18 in for R9-11. Black on white, retroreflective.
  • Place signs at the start of the closure, at the intersections before it, and where people should cross.

The Four Signs

The four MUTCD sidewalk closed signs R9-9, R9-10, R9-11 and R9-11a with sizes and where each goes
The MUTCD sidewalk closed signs and where each one belongs.

When DOT Needs a Permit

NYC DOT's Highway Rules require at least 5 ft of unobstructed sidewalk at all times. When an opening, excavation or construction work leaves less, the contractor needs a temporary sidewalk closing permit. Building a temporary walkway in the roadway is a separate DOT permit. Permits are filed through NYC DOT's NYCStreets system, usually by the contractor.

Sidewalk closing permit

Needed when less than 5 ft of clear sidewalk is left.

Temporary walkway in the roadway

A separate construction activity permit from DOT.

Sidewalk sheds and scaffolds

Need a DOB permit, and DOT permits may apply when they block the sidewalk.

Where to Place Them

  1. At the closureR9-9 Sidewalk Closed at the start of the closed section.
  2. At the intersections before itR9-11 Closed Ahead Cross Here, pointing to the open crosswalk, so people cross before reaching the work.
  3. Where people should crossR9-11a Cross Here just past the crossing point.
  4. When the other side is openR9-10 Use Other Side at the start of the closure.
A sign alone does not make a closure safe. The path must be continuous, accessible and protected by barriers that a cane can detect.

Materials and Mounting

OptionBest for
Reflective aluminum, 0.080 inLong jobs, mounted on posts, fences or barricades
Coroplast (corrugated plastic)Short jobs and quick changes
Sign on an A-frame or barricadeMoving the closure as work moves
Construction fence along a city street with orange barrels at the curb
Fences and barrels define the work zone; sidewalk signs tell people where to go.

Signs That Go With Them

Sidewalk closure signs sit alongside the job site signs DOB expects, such as the permit, contact and safety signs. See our NYC job site sign checklist, and for sheds, sidewalk shed signs in NYC.

Order Sidewalk Closed Signs

Send the job address, how many entries and crossings the closure has, and the mounting. We reply with a sign list, sizes and a price.

Sidewalk Closed Sign Questions, Answered

When do I need a sidewalk closing permit in NYC?

When the work leaves less than 5 ft of clear sidewalk. The permit comes from NYC DOT.

What size is a sidewalk closed sign?

The MUTCD R9-9 Sidewalk Closed sign is 24 x 12 in. R9-11 Closed Ahead Cross Here is 24 x 18 in.

What color are sidewalk closed signs?

Black letters and border on a white retroreflective background.

Where do I put a Cross Here sign?

R9-11 goes before the closure, pointing to an open crosswalk. R9-11a goes just past the crossing point.

Who files the DOT permit?

Usually the contractor, through NYC DOT's NYCStreets permit system.

Ask a Sign Maker

Have a question about signs for a sidewalk closure? Send the job address. A project manager answers by email within one business day.

Abie S., Signs NYC
Written by Abie S., Signs NYC

Abie S. writes for Signs NYC. Signs NYC has designed, built and installed signs and awnings in New York City since 1995, with shops in Brooklyn and Linden, NJ. About us

Sources and Further Reading

NYC DOT

Federal

Signs NYC

Link copied